Chilled storage June 1st 2007 When French based 3A
Group decided to bring its
storage facilities in-house,
it turned to Spaciotempo.
The chilled storage
specialists proposed a
building made of two
layers, built onto a
concrete slab and with a
high level of foam and
drip edge compression
sealing to create an airtight
unit.
The external layer
consisted of a standard
aluminium framed
structure covered with
single layer steel clad wall
panels and a PVC roof
system. Inside this, a
hermetic internal chamber
was assembled
engineered from insulated
sandwich panel side walls
and a suspended ceiling.
As well as eliminating
any impact from the sun's
rays, the external layer
also created an air space
offering the possibility of
a ventilation system
between the two layers. More articles from Spaciotempo UK Ltd: |